Frankley WTW
Birmingham

Through our joint venture meps with MWH Treatment, EPS delivered over £1m of off-site assemblies to the project.

Project Title

Utility

Client

MWHT/Severn Trent Water

Type

Lime Stabilisation/Mechanical DfMA

About the Project

This was a strategic project for Severn Trent Water to secure water supply to Birmingham city. Frankley WTW has capacity of 480MLD.

The project included:

  • New Lime Dosing Plant in existing Sludge Building to replace redundant lime plant

  • All packages designed in 3D, integrated with BIM software, factory manufactured, assembled, tested in-house and delivered safely in best practice configurations

  • Early engagement; 3D conceptual design; early site visits.

Our Collaborative Approach