Nereda® WwTP
Dungannon, NI

EPS provided a design, build and installation package for the reactor internals and pipework & Nereda reactors for a 25,000 PE Nereda WwTP. Project value £1.1m DB/DfMA package, in partnership with Murphy Process Engineering for NI Water.

Project Title

Utility

Client

NI Water/Murphy Process Engineering

Type

Nereda/Mechanical DfMA Package

About the Project

Dungannon is a 25,000 PE sidestream Nereda technology treatment plant. 

EPS’ scope on this project involved:

  • biological treatment using Nereda technology with 2 No. reactors, 1,800m3
  • design and manufacture of interconnecting pipework system
  • full design, manufacture and installation of the Nereda technology for the fit out of the Nereda reactors and sludge buffers
  • DfMA – 3D model, minimised site deliveries and installation time
  • early involvement to influence design
  • civil structure optimised to allow for standard modular install
  • 6 week reactors internal install
 
DB/DfMA Package
£ 1 M

2019

OPERATION START DATE

FACTORY FABRICATION
1 mths
POP. EQUIVALENT
100

Download our PDFs here:

Nereda in More Detail

Delivery Partners

Proudly working alongside