Mercury Engineering awarded this data centre cooling water contract to EPS in July 2020.

Project Title

Industrial Data Centre

Client

Mercury Engineering

Type

Filtration & Disinfection

About the Project

The contract consisted of the design; supply; offsite build and on-site commissioning of 2 No. Prepackaged Plant Rooms (PPRs) to a data centre in Frankfurt, Germany. 

Our Data Centre Experience

EPS has ten years of experience working with Mercury Engineering on data centre projects. We have a duty of care to Mercury and data centre operatives. We have designed a disinfection process specific to the demands and challenges of the data centre market. It’s easy to take disinfection for granted until something goes wrong and we have devised a unique method of maintaining safe water quality irrespective of the steep fluctuations in data centre water demand and site challenges.

Project Value
£ 0 M
Delivery Timeframe
1 wks
Heat rejection
1 MW
total demand
1 m³/day

Project Specifics

The arrangement of the PPRs are Duty/Assist with stored water tank loop disinfection.

Each RO system produces 24m3/hr of RO permeate to meet the Jaeggi cooling water specification. The project involves 450m3 of treated water storage and the maintenance of a residual disinfection level with the challenges of a varying data centre cooling water demand daily/monthly cycle.

EPS worked very closely with the Mercury site team and consultants Royal HaskoningDHV to deliver the PPRs on time, in specification and on budget.