Dairygold Milk Processing Plant Mitchelstown

EPS designed and upgraded Dairygold’s water softening plant which had a capacity of 10,000m3 per day. 

Project Title

Industrial Dairy

Client

Dairygold

Type

Water Softening

About the Project

This project consisted of:

  • 4.no 2m diameter softener vessels
  • 50ton bulk salt saturator
  • full PLC control