EPS entered into a joint venture with local civil partner El Concorde Construction in securing the contract.

Project Title

Utility

Client

Hashemite Kingdom of Jordan

Type

Aeration, Tertiary Filtration

About the Project

The overall project entailed the upgrade of the two wastewater treatment plants at Central Irbid (250,000 PE) and Wadi Arab (140,000 PE), to achieve wastewater suitable for agricultural re-use after nitrogen removal, filtration and disinfection.

Scope of Work

The MEICA package provided by EPS under the contract included the design, manufacture, delivery to site and commissioning of the following items:

  • 52 no. sand filter sets
  • 12 no. surface aerators
  • 4 no. UV disinfection assemblies
  • 2 no. rotating half bridge scraper systems
  • 9 no. pump sets (RAS, WAS & washwater)
  • 8 no. flow generators
  • 6 no. adjustable weir penstocks
  • Instrumentation package

Positive Impact

Northern Jordan has one of the world’s most arid climates, and the scarcity of water resources is a key challenge to the region’s governing authorities and the Water Authority of Jordan. The delivery of the Central Irbid / Wadi Arab project has had immense benefits to the local community, providing vastly improved irrigation supplies and enabling local reservoirs to be dedicated to the provision of high quality potable water to the population.