Atlantic Pond Electrical
Upgrade Cork

This project included the supply, installation, testing and process proving for a 12-month period of new mechanical and electrical equipment associated with the upgrading of the Atlantic Pond Pump Station and Ballinure Header chamber. 

Project Title

Utility

Client

Irish Water

Type

SCADA/ICA Systems Integration

About the Project

Atlantic Pond Pumping Station and Ballinure Header Chamber are active sites and remained in operation during upgrade works.

Removal of existing non-return valves from existing pipework on the delivery side of the foul pumps and storm pumps at Atlantic Pond Pumping Station.

Included for all modifications required to the existing pipework at the delivery side of the foul and storm pumps to allow for the installation of the new non-return valves.  

Supply, installation, testing and commissioning of VSDs for the Foul and Storm Pumps as specified. 

Upgrade SCADA and telemetry systems.