AMP5 Programme for
P-Removal

This project included the design, build & installation of chemical dosing systems at 26 sites.

Project Title

Utility

Client

Anglian Water/@oneAlliance

Type

Packaged Chemical Dosing

About the Project

Three standard products were agreed upon (5m3, 10m3 & 30m3) for all sites, the roll out of these projects were executed over a period of 30 months.

Other sites included: 

North Elmham STW; Upwood STW; Swaffham Prior STW; Ashbrook STW; Foulsham STW; Ellingham STW; Brandon STW; Great Gidding STW; Stanningfield STW; Bungay STW; Brockdish STW; Ditchingham STW; Great Whelnetham STW; Harleston STW; Long Stratton STW; Reepham STW; Sculthorpe STW; Leiston STW; Bylaugh STW; Wrentham STW; Burwell STW; Wappenham STW


Chemical Dosing Overview